|
With
the majority of the reskinning work completed, phase 2 begins. The new exhaust system is in-house and ready for installation,
and outer wing panels and flight controls are being prepared for painting.
|
|

Above and below: Left
wing re-skin during and after
|

Above and below: R wing tip fairing reinstalled after repair Stripping panels
|

Above and below: Outer
wing panels removed Wing
panels in A frame supports
|
|

|

|

|
|

Above and below: Exhaust
system before New R side exhaust system fitted and Tack welded into place
|

Major flight controls have
been removed from the tail.
|

|
|

|

|

|